2-45
JOHNSON CONTROLS
FORM 102.20-N1 (1109)
2
Coil Piping
Do not test, clean and ush piping
through this equipment.
Isolate this equipment from pressure
testing of water, steam gas and air
piping.
Consult the job specications and submittal drawings
for specic piping requirements, coil connection sizes
and location. The unit should be level to assure proper
venting and draining of coils. The piping arrangements
must provide for a balanced ow in multiple coil
installations (see Fig. 2-66 showing factory coil
connections).
Support all connecting piping independently of the
coils. Provide swing joints or exible ttings in all
piping connections, particularly adjacent to heating
coils, to absorb expansion and contraction strains.
Rigid piping connections can cause coil damage.
The coil supply and the return pipe connections are
labeled. When attaching piping to the coil header,
make the connection only tight enough to prevent
leaks. Excessive tightening may cause damage to the
header. A backup wrench should be rmly held on the
coil connection so that in tightening the connecting
piping the torque is not transmitted to the coil header,
thus damaging the coil connection.
Application Notes - All connections are male piping
thread except DX coils, which are solder. Drain and vent
taps on water coils are pipe thread shipped with plugs
installed. These taps are installed approximately two
inches back from the end of the threaded connections.
Pipe for balanced ow and assure even
airow.
Staggered Coils
Staggered Coils in Expanded Cabinet size units will
have connections brought to the unit exterior for liquid
or steam coils. DX coils are not included.
The external connections are either threaded pipe
or grooved pipe for the contractor to make his
connections when the media is liquid.
The external connections are threaded pipe for the
contractor to make his connections when the media
is steam.
The installing contractor is responsible for insulat-
ing piping extensions we provided inside the air
handler.
FIG. 2-67 – STAGGERED COIL CONFIGURATIONS
STAGGERED COIL – ANGLE WALL STAGGERED COIL – OPPOSITE
SIDE CONNECTIONS